{"id":1066,"date":"2026-09-18T04:11:13","date_gmt":"2026-09-18T09:11:13","guid":{"rendered":"https:\/\/cmitsolutions.com\/siliconvalley-ca-1019\/?p=1066"},"modified":"2026-09-25T04:24:13","modified_gmt":"2026-09-25T09:24:13","slug":"manufacturing-it-modernization-how-to-upgrade-critical-systems-without-disrupting-production","status":"publish","type":"post","link":"https:\/\/cmitsolutions.com\/siliconvalley-ca-1019\/blog\/manufacturing-it-modernization-how-to-upgrade-critical-systems-without-disrupting-production\/","title":{"rendered":"Manufacturing IT Modernization: How to Upgrade Critical Systems Without Disrupting Production"},"content":{"rendered":"<p><span style=\"font-weight: 400\">Manufacturing operations run on a delicate balance. Production lines, inventory systems, and quality control processes all depend on IT infrastructure that, in many facilities, has not been meaningfully updated in a decade or more. Yet the moment someone suggests modernizing that infrastructure, the first question from plant leadership is almost always the same: how do we do this without stopping production?<\/span><\/p>\n<p><span style=\"font-weight: 400\">It is a fair concern. Downtime in a manufacturing environment is not an inconvenience, it is a direct hit to revenue, delivery schedules, and customer relationships. But the alternative, continuing to run critical systems on aging, unsupported technology, carries its own growing risk. Legacy systems are more vulnerable to security incidents, harder to integrate with modern tools, and increasingly difficult to find qualified support for as vendors phase out maintenance.<\/span><\/p>\n<p><span style=\"font-weight: 400\">This guide walks through how manufacturing leaders in Silicon Valley and Pleasanton can approach IT modernization strategically, upgrading the systems that matter most while protecting the production schedules the business depends on.<\/span><\/p>\n<h2><b>Why Manufacturing IT Modernization Cannot Wait<\/b><\/h2>\n<p><span style=\"font-weight: 400\">Manufacturing environments face a unique set of pressures that make delayed modernization increasingly costly.<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400\"><b>Aging systems are harder to secure.<\/b><span style=\"font-weight: 400\"> Legacy operating systems and unsupported software often cannot run modern security tools, leaving critical systems exposed.<\/span><\/li>\n<li style=\"font-weight: 400\"><b>Vendor support windows are closing.<\/b><span style=\"font-weight: 400\"> Many industrial control systems and enterprise resource planning platforms in use today are approaching or past their end-of-life support dates.<\/span><\/li>\n<li style=\"font-weight: 400\"><b>Competitive pressure is increasing.<\/b><span style=\"font-weight: 400\"> Manufacturers running modern, connected systems can respond faster to demand changes, supply chain disruptions, and quality issues.<\/span><\/li>\n<li style=\"font-weight: 400\"><b>Talent expects modern tools.<\/b><span style=\"font-weight: 400\"> Skilled technicians and engineers increasingly expect to work with current technology, and outdated systems can affect recruitment and retention.<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400\">Waiting for a crisis, such as a system failure or security incident, to force modernization almost always costs more than a planned, phased approach.<\/span><\/p>\n<h2><b>The Core Challenge: Modernizing Without Disrupting Production<\/b><\/h2>\n<p><span style=\"font-weight: 400\">The reason manufacturing IT modernization differs so significantly from a typical office environment upgrade comes down to one factor: uptime requirements. A production line going offline unexpectedly can cost far more per hour than the entire modernization project itself.<\/span><\/p>\n<p><span style=\"font-weight: 400\">This reality shapes every decision in the modernization process, from timing to sequencing to rollback planning. The goal is never simply to upgrade systems. It is to upgrade systems while production keeps running, or with disruption limited to pre-approved, minimal windows.<\/span><\/p>\n<h2><b>Step 1: Assess the Current Environment Thoroughly<\/b><\/h2>\n<p><span style=\"font-weight: 400\">Before touching any system, manufacturing leaders need a complete picture of what is actually running across the facility. This step is frequently rushed, and rushing it is where most modernization problems begin.<\/span><\/p>\n<p><span style=\"font-weight: 400\">A thorough assessment should cover:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400\"><b>Operational technology inventory.<\/b><span style=\"font-weight: 400\"> Every programmable logic controller, sensor, and industrial control system connected to the network, along with its age and support status<\/span><\/li>\n<li style=\"font-weight: 400\"><b>IT infrastructure inventory.<\/b><span style=\"font-weight: 400\"> Servers, network hardware, and software platforms supporting enterprise functions like ERP, inventory, and quality management<\/span><\/li>\n<li style=\"font-weight: 400\"><b>Network architecture.<\/b><span style=\"font-weight: 400\"> How operational technology and information technology networks are segmented, or whether they are dangerously intermixed<\/span><\/li>\n<li style=\"font-weight: 400\"><b>Dependency mapping.<\/b><span style=\"font-weight: 400\"> Which systems depend on which others, so modernization sequencing does not accidentally break something unrelated<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400\">A structured<\/span><a href=\"https:\/\/cmitsolutions.com\/siliconvalley-ca-1019\/network-management\/\"> <span style=\"font-weight: 400\">network management services<\/span><\/a><span style=\"font-weight: 400\"> review is typically the starting point for this assessment, since network architecture underpins nearly every other system in the facility.<\/span><\/p>\n<h2><b>Step 2: Prioritize Based on Risk and Business Impact<\/b><\/h2>\n<p><span style=\"font-weight: 400\">Not every system needs to be modernized at once, and attempting a full overhaul simultaneously is one of the fastest ways to create unnecessary disruption. Instead, prioritize based on a combination of risk and impact.<\/span><\/p>\n<p><b>High priority candidates typically include:<\/b><\/p>\n<ul>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">Systems running on unsupported operating systems with known vulnerabilities<\/span><\/li>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">Single points of failure with no redundancy or backup system<\/span><\/li>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">Systems that are increasingly difficult to find replacement parts or support for<\/span><\/li>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">Systems directly tied to safety or regulatory compliance<\/span><\/li>\n<\/ul>\n<p><b>Lower priority candidates:<\/b><\/p>\n<ul>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">Systems that are stable, supported, and not creating operational bottlenecks<\/span><\/li>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">Systems scheduled for replacement as part of a planned equipment refresh<\/span><\/li>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">Systems with limited integration to other critical infrastructure<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400\">This prioritization framework helps manufacturing leaders focus resources where risk reduction and business value are highest, rather than modernizing systems simply because they are old.<\/span><\/p>\n<h2><b>Step 3: Separate IT and OT Networks Properly<\/b><\/h2>\n<p><span style=\"font-weight: 400\">One of the most common and most dangerous findings during manufacturing assessments is a flat network where information technology and operational technology systems are not properly segmented. This means a vulnerability in an office computer could potentially reach a production line controller.<\/span><\/p>\n<p><span style=\"font-weight: 400\">Proper segmentation involves:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">Establishing clear network zones between corporate IT, plant floor OT, and any guest or vendor access<\/span><\/li>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">Implementing firewalls and monitoring between zones to detect unusual traffic<\/span><\/li>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">Limiting remote access to OT systems to only what is strictly necessary<\/span><\/li>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">Documenting and regularly reviewing which devices exist in each network zone<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400\">This segmentation work can often be done in phases without disrupting production, since it primarily involves network configuration rather than replacing production equipment itself.<\/span><\/p>\n<h2><b>Step 4: Modernize in Phases, Not All at Once<\/b><\/h2>\n<p><span style=\"font-weight: 400\">Phased modernization is the single most effective strategy for balancing upgrade needs with production continuity. Rather than a single large cutover, break the project into stages that can each be validated before moving forward.<\/span><\/p>\n<p><span style=\"font-weight: 400\">A typical phased approach includes:<\/span><\/p>\n<h3><b>Phase 1: Foundation work<\/b><\/h3>\n<ul>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">Network segmentation and security baseline improvements<\/span><\/li>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">Backup and disaster recovery validation for existing systems<\/span><\/li>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">Establishing monitoring and visibility across the environment<\/span><\/li>\n<\/ul>\n<h3><b>Phase 2: Non-production system upgrades<\/b><\/h3>\n<ul>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">Modernizing office and administrative systems that do not touch the production line directly<\/span><\/li>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">Upgrading enterprise resource planning and inventory management platforms during planned maintenance windows<\/span><\/li>\n<\/ul>\n<h3><b>Phase 3: Production-adjacent systems<\/b><\/h3>\n<ul>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">Upgrading systems that support but do not directly control production, such as quality management or reporting tools<\/span><\/li>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">Testing new systems in parallel with legacy systems before full cutover<\/span><\/li>\n<\/ul>\n<h3><b>Phase 4: Production-critical systems<\/b><\/h3>\n<ul>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">Scheduling upgrades during planned maintenance windows or facility downtime<\/span><\/li>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">Running new systems in parallel where possible before decommissioning legacy equipment<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400\">This sequencing allows teams to build confidence and refine processes on lower-risk systems before tackling the systems that truly cannot afford unplanned downtime.<\/span><\/p>\n<p><img decoding=\"async\" class=\"aligncenter wp-image-1068\" src=\"https:\/\/cmitsolutions.com\/siliconvalley-ca-1019\/wp-content\/uploads\/sites\/96\/2026\/09\/33-1024x535.png\" alt=\"\" width=\"842\" height=\"440\" srcset=\"https:\/\/cmitsolutions.com\/siliconvalley-ca-1019\/wp-content\/uploads\/sites\/96\/2026\/09\/33-1024x535.png 1024w, https:\/\/cmitsolutions.com\/siliconvalley-ca-1019\/wp-content\/uploads\/sites\/96\/2026\/09\/33-300x157.png 300w, https:\/\/cmitsolutions.com\/siliconvalley-ca-1019\/wp-content\/uploads\/sites\/96\/2026\/09\/33-768x401.png 768w, https:\/\/cmitsolutions.com\/siliconvalley-ca-1019\/wp-content\/uploads\/sites\/96\/2026\/09\/33.png 1200w\" sizes=\"(max-width: 842px) 100vw, 842px\" \/><\/p>\n<h2><b>Step 5: Build Redundancy Before You Need It<\/b><\/h2>\n<p><span style=\"font-weight: 400\">One of the most effective ways to reduce modernization risk is ensuring redundant systems and reliable backups exist before any upgrade work begins. If something goes wrong during a migration, the ability to fail over or restore quickly determines whether the incident is a minor hiccup or a major production loss.<\/span><\/p>\n<p><span style=\"font-weight: 400\">Key redundancy considerations:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">Are backups tested regularly, not just scheduled?<\/span><\/li>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">Is there a documented rollback plan for every planned system change?<\/span><\/li>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">Can critical systems fail over to a backup environment without manual intervention?<\/span><\/li>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">How long would recovery actually take if a migration went wrong mid-process?<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400\">Strengthening<\/span><a href=\"https:\/\/cmitsolutions.com\/siliconvalley-ca-1019\/data-backup\/\"> <span style=\"font-weight: 400\">data backup solutions<\/span><\/a><span style=\"font-weight: 400\"> before modernization begins is one of the highest-value steps a manufacturing IT team can take, since it directly reduces the risk associated with every subsequent phase of the project.<\/span><\/p>\n<h2><b>Step 6: Schedule Around Production, Not Convenience<\/b><\/h2>\n<p><span style=\"font-weight: 400\">Manufacturing modernization projects need to be planned around the production calendar, not the IT team&#8217;s preferred timeline. This requires close coordination between IT, operations, and plant leadership from the earliest planning stages.<\/span><\/p>\n<p><span style=\"font-weight: 400\">Practical scheduling strategies:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">Identify planned maintenance windows, seasonal slowdowns, or shift changes that offer natural opportunities for upgrade work<\/span><\/li>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">Break large changes into smaller windows that fit within existing maintenance schedules<\/span><\/li>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">Build in buffer time for unexpected issues without threatening the broader production schedule<\/span><\/li>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">Communicate timelines clearly to plant floor supervisors so expectations are aligned<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400\">Manufacturing leaders who involve operations stakeholders early in the planning process consistently experience smoother rollouts than those who treat modernization as a purely IT-driven initiative.<\/span><\/p>\n<h2><b>Step 7: Address Cloud and Hybrid Infrastructure Needs<\/b><\/h2>\n<p><span style=\"font-weight: 400\">Many manufacturers are shifting enterprise systems, such as ERP and inventory management, to cloud or hybrid environments while keeping production-critical operational technology on premises. This hybrid approach offers flexibility but requires careful planning.<\/span><\/p>\n<p><span style=\"font-weight: 400\">Considerations for cloud migration in a manufacturing context:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">Which systems genuinely benefit from cloud flexibility versus which need to remain on premises for latency or reliability reasons<\/span><\/li>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">Bandwidth requirements to support cloud connectivity without affecting plant floor network performance<\/span><\/li>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">Data synchronization between on-premises production systems and cloud-based business systems<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400\">A structured<\/span><a href=\"https:\/\/cmitsolutions.com\/siliconvalley-ca-1019\/cloud-services\/\"> <span style=\"font-weight: 400\">cloud services<\/span><\/a><span style=\"font-weight: 400\"> evaluation helps manufacturers determine the right balance between cloud flexibility and the reliability demands of the production floor.<\/span><\/p>\n<h2><b>Step 8: Strengthen Security Throughout the Process<\/b><\/h2>\n<p><span style=\"font-weight: 400\">Modernization projects introduce a window of increased vulnerability, as new systems are configured and legacy systems are decommissioned. Security needs to be built into every phase rather than addressed after the fact.<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">Apply least-privilege access to any new systems introduced during modernization<\/span><\/li>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">Monitor network traffic closely during transition periods for unusual activity<\/span><\/li>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">Ensure vendor and contractor access used during implementation is tightly controlled and time-limited<\/span><\/li>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">Confirm any new systems meet the organization&#8217;s compliance requirements before going live<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400\">Given the regulatory considerations many manufacturers face, whether through customer contracts, industry standards, or government contracts, reviewing<\/span><a href=\"https:\/\/cmitsolutions.com\/siliconvalley-ca-1019\/compliance\/\"> <span style=\"font-weight: 400\">compliance management services<\/span><\/a><span style=\"font-weight: 400\"> requirements early in the modernization process helps avoid costly rework later.<\/span><\/p>\n<h2><b>Step 9: Prepare the Workforce for Change<\/b><\/h2>\n<p><span style=\"font-weight: 400\">New systems only deliver value if the people using them are prepared. Manufacturing modernization projects frequently underestimate the training and change management effort required on the plant floor.<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">Provide hands-on training well before go-live dates, not just documentation<\/span><\/li>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">Identify and train floor-level champions who can support their teams during the transition<\/span><\/li>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">Build a clear escalation path for issues that arise immediately after cutover<\/span><\/li>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">Gather feedback during parallel testing phases to catch usability issues early<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400\">A well-managed<\/span><a href=\"https:\/\/cmitsolutions.com\/siliconvalley-ca-1019\/it-support\/\"> <span style=\"font-weight: 400\">IT support<\/span><\/a><span style=\"font-weight: 400\"> function during the transition period gives plant staff a reliable resource to turn to when questions or issues come up, reducing the temptation to work around new systems in ways that create risk.<\/span><\/p>\n<h2><b>Common Mistakes That Cause Unplanned Downtime<\/b><\/h2>\n<p><span style=\"font-weight: 400\">Several recurring mistakes are responsible for most unplanned disruptions during manufacturing IT modernization:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400\"><b>Skipping the dependency mapping step<\/b><span style=\"font-weight: 400\">, leading to unexpected system interactions during cutover<\/span><\/li>\n<li style=\"font-weight: 400\"><b><\/b><b><\/b><b><\/b><b><\/b><b><\/b><b><\/b><b><\/b><b><\/b><b><\/b><b><\/b><b><\/b><b><\/b><b>Underestimating testing time<\/b><span style=\"font-weight: 400\">, rushing new systems into production before they are fully validated<\/span><\/li>\n<li style=\"font-weight: 400\"><b>Failing to involve operations leadership early<\/b><span style=\"font-weight: 400\">, resulting in scheduling conflicts with production needs<\/span><\/li>\n<li style=\"font-weight: 400\"><b>Not validating backups before starting<\/b><span style=\"font-weight: 400\">, leaving no reliable fallback if something goes wrong<\/span><\/li>\n<li style=\"font-weight: 400\"><b>Treating security as a final step<\/b><span style=\"font-weight: 400\">, rather than building it into the modernization plan from the start<\/span><\/li>\n<li style=\"font-weight: 400\"><b>Attempting too much change at once<\/b><span style=\"font-weight: 400\">, rather than following a phased, validated approach<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400\">Avoiding these mistakes generally comes down to disciplined planning and realistic timelines rather than any single technical fix.<\/span><\/p>\n<h2><b>Building the Modernization Roadmap<\/b><\/h2>\n<p><span style=\"font-weight: 400\">A practical manufacturing modernization roadmap typically spans twelve to eighteen months for a mid-sized facility, structured around the phased approach outlined earlier.<\/span><\/p>\n<h3><b>Months 1 to 2: Assessment and planning<\/b><\/h3>\n<ul>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">Complete infrastructure and OT inventory<\/span><\/li>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">Map system dependencies and identify high-risk systems<\/span><\/li>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">Build the phased implementation plan with operations stakeholders<\/span><\/li>\n<\/ul>\n<h3><b>Months 3 to 5: Foundation work<\/b><\/h3>\n<ul>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">Network segmentation between IT and OT environments<\/span><\/li>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">Backup and disaster recovery validation<\/span><\/li>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">Security baseline improvements across the environment<\/span><\/li>\n<\/ul>\n<h3><b>Months 6 to 10: Non-production and production-adjacent upgrades<\/b><\/h3>\n<ul>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">Modernize administrative and enterprise systems<\/span><\/li>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">Upgrade quality management and reporting tools<\/span><\/li>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">Run parallel testing for production-adjacent systems<\/span><\/li>\n<\/ul>\n<h3><b>Months 11 to 18: Production-critical system upgrades<\/b><\/h3>\n<ul>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">Schedule upgrades during planned maintenance windows<\/span><\/li>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">Complete parallel testing and validated cutover<\/span><\/li>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">Decommission legacy systems once new systems are confirmed stable<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400\">This timeline can be compressed or extended depending on facility size, system complexity, and available resources, but the sequencing logic remains consistent across most manufacturing environments.<\/span><\/p>\n<h2><b>The Role of Managed IT Partners in Manufacturing Modernization<\/b><\/h2>\n<p><span style=\"font-weight: 400\">Very few manufacturing IT teams have the bandwidth to plan and execute a full modernization project on top of daily operational demands. This is where an experienced managed IT partner becomes particularly valuable.<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400\"><b>Assessment expertise.<\/b><span style=\"font-weight: 400\"> Structured evaluation of both IT and OT environments, identifying risk and prioritization opportunities the internal team may miss<\/span><\/li>\n<li style=\"font-weight: 400\"><b>Project management.<\/b><span style=\"font-weight: 400\"> Coordinating phased implementation around production schedules without pulling internal staff away from daily responsibilities<\/span><\/li>\n<li style=\"font-weight: 400\"><b>Ongoing support.<\/b><span style=\"font-weight: 400\"> Providing reliable support during and after the transition to catch issues before they affect production<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400\">CMIT Solutions works with manufacturing companies across Silicon Valley and Pleasanton to plan and execute IT modernization projects that protect production continuity while addressing the security and reliability gaps that come with aging infrastructure. This kind of<\/span><a href=\"https:\/\/cmitsolutions.com\/siliconvalley-ca-1019\/it-guidance\/\"> <span style=\"font-weight: 400\">strategic IT guidance<\/span><\/a><span style=\"font-weight: 400\"> helps manufacturing leaders move forward with confidence rather than guesswork.<\/span><\/p>\n<p><span style=\"font-weight: 400\">For organizations trying to determine the right scope of ongoing support during and after modernization, reviewing available<\/span><a href=\"https:\/\/cmitsolutions.com\/siliconvalley-ca-1019\/packages\/\"> <span style=\"font-weight: 400\">IT service packages<\/span><\/a><span style=\"font-weight: 400\"> is a useful starting point.<\/span><\/p>\n<p><img decoding=\"async\" class=\"aligncenter wp-image-1069\" src=\"https:\/\/cmitsolutions.com\/siliconvalley-ca-1019\/wp-content\/uploads\/sites\/96\/2026\/09\/34-1024x535.png\" alt=\"\" width=\"827\" height=\"432\" srcset=\"https:\/\/cmitsolutions.com\/siliconvalley-ca-1019\/wp-content\/uploads\/sites\/96\/2026\/09\/34-1024x535.png 1024w, https:\/\/cmitsolutions.com\/siliconvalley-ca-1019\/wp-content\/uploads\/sites\/96\/2026\/09\/34-300x157.png 300w, https:\/\/cmitsolutions.com\/siliconvalley-ca-1019\/wp-content\/uploads\/sites\/96\/2026\/09\/34-768x401.png 768w, https:\/\/cmitsolutions.com\/siliconvalley-ca-1019\/wp-content\/uploads\/sites\/96\/2026\/09\/34.png 1200w\" sizes=\"(max-width: 827px) 100vw, 827px\" \/><\/p>\n<h2><b>Communication Systems and Plant Floor Coordination<\/b><\/h2>\n<p><span style=\"font-weight: 400\">Modernization efforts often extend beyond core infrastructure into how teams communicate across the facility. Reliable communication tools become especially important during transition periods, when coordination between IT, operations, and plant floor staff is critical.<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">Ensure communication platforms used for coordinating maintenance windows are reliable and accessible to all relevant staff<\/span><\/li>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">Standardize on tools that provide clear documentation of decisions and changes during the modernization process<\/span><\/li>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">Confirm emergency communication paths are tested before major cutover events<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400\">Businesses relying on fragmented<\/span><a href=\"https:\/\/cmitsolutions.com\/siliconvalley-ca-1019\/unified-communications\/\"> <span style=\"font-weight: 400\">unified communications<\/span><\/a><span style=\"font-weight: 400\"> tools during a modernization project often find that coordination gaps contribute to avoidable delays and confusion.<\/span><\/p>\n<h2><b>Procurement Considerations for Modernization Projects<\/b><\/h2>\n<p><span style=\"font-weight: 400\">Manufacturing modernization projects typically involve significant hardware and software procurement, and how that procurement is managed affects both cost and timeline.<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">Build procurement lead times into the overall project schedule, particularly for specialized industrial hardware<\/span><\/li>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">Evaluate vendor support and long-term maintenance commitments, not just upfront cost<\/span><\/li>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">Consider standardizing on platforms that integrate well with existing systems to reduce future complexity<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400\">Working through a structured<\/span><a href=\"https:\/\/cmitsolutions.com\/siliconvalley-ca-1019\/it-services-procurement\/\"> <span style=\"font-weight: 400\">IT services procurement<\/span><\/a><span style=\"font-weight: 400\"> process helps avoid the common trap of purchasing equipment that does not align with the broader modernization strategy.<\/span><\/p>\n<h2><b>Why Local Expertise Matters for Bay Area Manufacturers<\/b><\/h2>\n<p><span style=\"font-weight: 400\">Manufacturers operating in Silicon Valley and Pleasanton face a distinct set of pressures, from competing for skilled technical talent to meeting the expectations of customers who increasingly demand transparency and reliability from their supply chain partners. Working with a technology partner who understands both the regional business environment and the operational realities of manufacturing makes a measurable difference in how smoothly a modernization project unfolds.<\/span><\/p>\n<p><span style=\"font-weight: 400\">CMIT Solutions has supported manufacturing companies across the region through infrastructure assessments, phased modernization projects, and ongoing system management. Reviewing<\/span><a href=\"https:\/\/cmitsolutions.com\/siliconvalley-ca-1019\/case-studies\/\"> <span style=\"font-weight: 400\">real world case studies<\/span><\/a><span style=\"font-weight: 400\"> from similar engagements offers a practical sense of what a well-executed modernization project looks like in a live production environment.<\/span><\/p>\n<p><span style=\"font-weight: 400\">Support from a team backed by recognized<\/span><a href=\"https:\/\/cmitsolutions.com\/siliconvalley-ca-1019\/partners-and-certifications\/\"> <span style=\"font-weight: 400\">certified technology partners<\/span><\/a><span style=\"font-weight: 400\"> also ensures modernization recommendations are grounded in proven industry practices.<\/span><span style=\"font-weight: 400\"> Learn more about the team behind this work on the<\/span><a href=\"https:\/\/cmitsolutions.com\/siliconvalley-ca-1019\/about\/\"> <span style=\"font-weight: 400\">Silicon Valley IT team<\/span><\/a><span style=\"font-weight: 400\"> page, or explore the full scope of available services from the<\/span><a href=\"https:\/\/cmitsolutions.com\/siliconvalley-ca-1019\/\"> <span style=\"font-weight: 400\">Pleasanton IT provider<\/span><\/a><span style=\"font-weight: 400\"> home page.<\/span><\/p>\n<h2><b>Final Thoughts for Manufacturing Leaders<\/b><\/h2>\n<p><span style=\"font-weight: 400\">Manufacturing IT modernization does not have to mean choosing between progress and production continuity. A thorough assessment, disciplined prioritization, phased implementation, and strong communication with operations stakeholders allow critical systems to be upgraded without putting production schedules at risk. The manufacturers who approach modernization this way consistently come out ahead of those who either delay upgrades indefinitely or attempt sweeping changes without proper planning.<\/span><\/p>\n<p><span style=\"font-weight: 400\">The team at CMIT Solutions in Silicon Valley and Pleasanton has helped manufacturing organizations plan and execute modernization projects that protect uptime while closing the security and reliability gaps created by aging infrastructure.<\/span><\/p>\n<p><span style=\"font-weight: 400\">If legacy systems are creating growing risk on your production floor, the right first step is a thorough assessment before any changes begin.<\/span><a href=\"https:\/\/cmitsolutions.com\/siliconvalley-ca-1019\/contact-us\/\"> <span style=\"font-weight: 400\">Schedule a consultation<\/span><\/a><span style=\"font-weight: 400\"> with a team that plans manufacturing modernization projects every day.<\/span><\/p>\n<div style=\"width: 100%;background: #f4f8fa;padding: 60px 20px;font-family: Segoe UI,Arial,sans-serif\">\n<h2 style=\"text-align: center;color: #000;font-size: 40px;line-height: 1.2;font-weight: 800;margin: 0 0 45px\">Frequently Asked Questions<\/h2>\n<div style=\"width: 100%;max-width: 1100px;margin: 0 auto\">\n<details style=\"width: 100%;background: #fff;border-radius: 14px;margin: 0 0 18px;padding: 0 28px;overflow: hidden\">\n<summary style=\"cursor: pointer;position: relative;padding: 24px 48px 24px 0;font-size: 19px;line-height: 1.5;font-weight: 600;color: #111\">1. What is manufacturing IT modernization?<span style=\"position: absolute;right: 0;color: #f46048;font-size: 28px;line-height: 1;font-weight: bold\">+<\/span><\/summary>\n<div style=\"padding: 0 0 24px;color: #444;font-size: 16px;line-height: 1.7\">Manufacturing IT modernization is the process of upgrading outdated information technology and operational technology systems to improve security, reliability, performance, and efficiency while minimizing disruption to production.<\/div>\n<\/details>\n<details style=\"width: 100%;background: #fff;border-radius: 14px;margin: 0 0 18px;padding: 0 28px;overflow: hidden\">\n<summary style=\"cursor: pointer;position: relative;padding: 24px 48px 24px 0;font-size: 19px;line-height: 1.5;font-weight: 600;color: #111\">2. Why is IT modernization riskier in manufacturing than in other industries?<span style=\"position: absolute;right: 0;color: #f46048;font-size: 28px;line-height: 1;font-weight: bold\">+<\/span><\/summary>\n<div style=\"padding: 0 0 24px;color: #444;font-size: 16px;line-height: 1.7\">Manufacturing environments often depend on interconnected systems that directly support production. An unsuccessful upgrade can affect equipment availability, production schedules, quality, safety, or delivery commitments, making careful planning and sequencing particularly important.<\/div>\n<\/details>\n<details style=\"width: 100%;background: #fff;border-radius: 14px;margin: 0 0 18px;padding: 0 28px;overflow: hidden\">\n<summary style=\"cursor: pointer;position: relative;padding: 24px 48px 24px 0;font-size: 19px;line-height: 1.5;font-weight: 600;color: #111\">3. How long does a manufacturing IT modernization project typically take?<span style=\"position: absolute;right: 0;color: #f46048;font-size: 28px;line-height: 1;font-weight: bold\">+<\/span><\/summary>\n<div style=\"padding: 0 0 24px;color: #444;font-size: 16px;line-height: 1.7\">The timeline varies considerably depending on facility size, system complexity, production schedules, legacy equipment, compliance requirements, and the scope of modernization. Smaller projects may take weeks or months, while comprehensive multi-phase programs can extend over a year or longer.<\/div>\n<\/details>\n<details style=\"width: 100%;background: #fff;border-radius: 14px;margin: 0 0 18px;padding: 0 28px;overflow: hidden\">\n<summary style=\"cursor: pointer;position: relative;padding: 24px 48px 24px 0;font-size: 19px;line-height: 1.5;font-weight: 600;color: #111\">4. What is the first step in a manufacturing modernization project?<span style=\"position: absolute;right: 0;color: #f46048;font-size: 28px;line-height: 1;font-weight: bold\">+<\/span><\/summary>\n<div style=\"padding: 0 0 24px;color: #444;font-size: 16px;line-height: 1.7\">Start with a thorough assessment of both IT and operational technology environments. This should include an inventory of systems, applications, network connections, dependencies, security controls, support status, and business-critical production processes.<\/div>\n<\/details>\n<details style=\"width: 100%;background: #fff;border-radius: 14px;margin: 0 0 18px;padding: 0 28px;overflow: hidden\">\n<summary style=\"cursor: pointer;position: relative;padding: 24px 48px 24px 0;font-size: 19px;line-height: 1.5;font-weight: 600;color: #111\">5. What does IT and OT network segmentation mean?<span style=\"position: absolute;right: 0;color: #f46048;font-size: 28px;line-height: 1;font-weight: bold\">+<\/span><\/summary>\n<div style=\"padding: 0 0 24px;color: #444;font-size: 16px;line-height: 1.7\">IT and OT network segmentation separates business information systems, such as employee computers and administrative applications, from operational technology such as industrial controllers and production equipment. Proper segmentation can limit unnecessary communication between environments and reduce the potential spread of a security incident.<\/div>\n<\/details>\n<details style=\"width: 100%;background: #fff;border-radius: 14px;margin: 0 0 18px;padding: 0 28px;overflow: hidden\">\n<summary style=\"cursor: pointer;position: relative;padding: 24px 48px 24px 0;font-size: 19px;line-height: 1.5;font-weight: 600;color: #111\">6. Can modernization be done without any production downtime at all?<span style=\"position: absolute;right: 0;color: #f46048;font-size: 28px;line-height: 1;font-weight: bold\">+<\/span><\/summary>\n<div style=\"padding: 0 0 24px;color: #444;font-size: 16px;line-height: 1.7\">Some modernization work can be completed with little or no production interruption through phased implementation, parallel systems, testing, and careful scheduling. However, certain production-critical upgrades may still require planned maintenance windows or controlled downtime.<\/div>\n<\/details>\n<details style=\"width: 100%;background: #fff;border-radius: 14px;margin: 0 0 18px;padding: 0 28px;overflow: hidden\">\n<summary style=\"cursor: pointer;position: relative;padding: 24px 48px 24px 0;font-size: 19px;line-height: 1.5;font-weight: 600;color: #111\">7. What systems should be prioritized first in a modernization project?<span style=\"position: absolute;right: 0;color: #f46048;font-size: 28px;line-height: 1;font-weight: bold\">+<\/span><\/summary>\n<div style=\"padding: 0 0 24px;color: #444;font-size: 16px;line-height: 1.7\">Priority is typically given to unsupported or vulnerable systems, single points of failure, unreliable infrastructure, and systems connected to critical production, safety, security, or compliance requirements.<\/div>\n<\/details>\n<details style=\"width: 100%;background: #fff;border-radius: 14px;margin: 0 0 18px;padding: 0 28px;overflow: hidden\">\n<summary style=\"cursor: pointer;position: relative;padding: 24px 48px 24px 0;font-size: 19px;line-height: 1.5;font-weight: 600;color: #111\">8. How does backup and disaster recovery planning factor into modernization?<span style=\"position: absolute;right: 0;color: #f46048;font-size: 28px;line-height: 1;font-weight: bold\">+<\/span><\/summary>\n<div style=\"padding: 0 0 24px;color: #444;font-size: 16px;line-height: 1.7\">Reliable and tested backups provide a recovery option if an upgrade, migration, configuration change, or equipment replacement does not go as planned. Recovery procedures should be documented and validated before critical changes begin.<\/div>\n<\/details>\n<details style=\"width: 100%;background: #fff;border-radius: 14px;margin: 0 0 18px;padding: 0 28px;overflow: hidden\">\n<summary style=\"cursor: pointer;position: relative;padding: 24px 48px 24px 0;font-size: 19px;line-height: 1.5;font-weight: 600;color: #111\">9. Should cloud migration be part of a manufacturing modernization strategy?<span style=\"position: absolute;right: 0;color: #f46048;font-size: 28px;line-height: 1;font-weight: bold\">+<\/span><\/summary>\n<div style=\"padding: 0 0 24px;color: #444;font-size: 16px;line-height: 1.7\">Cloud services can be appropriate for workloads such as collaboration, business applications, analytics, ERP, or inventory management. Production-critical OT systems may have different latency, reliability, integration, safety, or connectivity requirements, so each workload should be evaluated individually.<\/div>\n<\/details>\n<details style=\"width: 100%;background: #fff;border-radius: 14px;margin: 0 0 18px;padding: 0 28px;overflow: hidden\">\n<summary style=\"cursor: pointer;position: relative;padding: 24px 48px 24px 0;font-size: 19px;line-height: 1.5;font-weight: 600;color: #111\">10. What role does employee training play in successful modernization?<span style=\"position: absolute;right: 0;color: #f46048;font-size: 28px;line-height: 1;font-weight: bold\">+<\/span><\/summary>\n<div style=\"padding: 0 0 24px;color: #444;font-size: 16px;line-height: 1.7\">Training helps employees understand new systems, workflows, security requirements, and escalation procedures before changes go live. Providing accessible support during the transition can also reduce confusion and discourage employees from creating unsafe workarounds.<\/div>\n<\/details>\n<details style=\"width: 100%;background: #fff;border-radius: 14px;margin: 0 0 18px;padding: 0 28px;overflow: hidden\">\n<summary style=\"cursor: pointer;position: relative;padding: 24px 48px 24px 0;font-size: 19px;line-height: 1.5;font-weight: 600;color: #111\">11. How can manufacturers avoid unplanned downtime during upgrades?<span style=\"position: absolute;right: 0;color: #f46048;font-size: 28px;line-height: 1;font-weight: bold\">+<\/span><\/summary>\n<div style=\"padding: 0 0 24px;color: #444;font-size: 16px;line-height: 1.7\">Detailed dependency mapping, phased implementation, testing, backups, rollback procedures, maintenance windows, and close coordination between IT, OT, operations, vendors, and leadership can significantly reduce the risk of unexpected disruption.<\/div>\n<\/details>\n<details style=\"width: 100%;background: #fff;border-radius: 14px;margin: 0 0 18px;padding: 0 28px;overflow: hidden\">\n<summary style=\"cursor: pointer;position: relative;padding: 24px 48px 24px 0;font-size: 19px;line-height: 1.5;font-weight: 600;color: #111\">12. What is the biggest security risk during a modernization project?<span style=\"position: absolute;right: 0;color: #f46048;font-size: 28px;line-height: 1;font-weight: bold\">+<\/span><\/summary>\n<div style=\"padding: 0 0 24px;color: #444;font-size: 16px;line-height: 1.7\">The transition period can introduce additional risk because systems, permissions, integrations, network paths, and configurations are changing. Temporary connections, legacy systems, or incorrectly configured new technology should be closely controlled and monitored throughout the project.<\/div>\n<\/details>\n<details style=\"width: 100%;background: #fff;border-radius: 14px;margin: 0 0 18px;padding: 0 28px;overflow: hidden\">\n<summary style=\"cursor: pointer;position: relative;padding: 24px 48px 24px 0;font-size: 19px;line-height: 1.5;font-weight: 600;color: #111\">13. Should modernization projects be managed internally or with an outside partner?<span style=\"position: absolute;right: 0;color: #f46048;font-size: 28px;line-height: 1;font-weight: bold\">+<\/span><\/summary>\n<div style=\"padding: 0 0 24px;color: #444;font-size: 16px;line-height: 1.7\">The right approach depends on internal expertise, available resources, project complexity, and the technologies involved. Outside IT, cybersecurity, automation, or OT specialists can supplement internal teams when additional assessment, migration, security, or project management expertise is needed.<\/div>\n<\/details>\n<details style=\"width: 100%;background: #fff;border-radius: 14px;margin: 0 0 18px;padding: 0 28px;overflow: hidden\">\n<summary style=\"cursor: pointer;position: relative;padding: 24px 48px 24px 0;font-size: 19px;line-height: 1.5;font-weight: 600;color: #111\">14. How should modernization work be scheduled around production?<span style=\"position: absolute;right: 0;color: #f46048;font-size: 28px;line-height: 1;font-weight: bold\">+<\/span><\/summary>\n<div style=\"padding: 0 0 24px;color: #444;font-size: 16px;line-height: 1.7\">High-impact work can be aligned with planned maintenance windows, scheduled shutdowns, seasonal slowdowns, or other periods when production impact can be minimized. IT and operations teams should coordinate schedules, dependencies, rollback plans, and testing requirements well in advance.<\/div>\n<\/details>\n<details style=\"width: 100%;background: #fff;border-radius: 14px;margin: 0 0 18px;padding: 0 28px;overflow: hidden\">\n<summary style=\"cursor: pointer;position: relative;padding: 24px 48px 24px 0;font-size: 19px;line-height: 1.5;font-weight: 600;color: #111\">15. What happens if a legacy system fails before modernization is complete?<span style=\"position: absolute;right: 0;color: #f46048;font-size: 28px;line-height: 1;font-weight: bold\">+<\/span><\/summary>\n<div style=\"padding: 0 0 24px;color: #444;font-size: 16px;line-height: 1.7\">A legacy system failure can interrupt operations and accelerate the need for replacement or recovery. Prioritizing unsupported systems and single points of failure early, while maintaining backups, spare components where practical, and contingency plans, can reduce the impact.<\/div>\n<\/details>\n<details style=\"width: 100%;background: #fff;border-radius: 14px;margin: 0 0 18px;padding: 0 28px;overflow: hidden\">\n<summary style=\"cursor: pointer;position: relative;padding: 24px 48px 24px 0;font-size: 19px;line-height: 1.5;font-weight: 600;color: #111\">16. Does modernization affect compliance requirements?<span style=\"position: absolute;right: 0;color: #f46048;font-size: 28px;line-height: 1;font-weight: bold\">+<\/span><\/summary>\n<div style=\"padding: 0 0 24px;color: #444;font-size: 16px;line-height: 1.7\">It can. Manufacturers may need to consider applicable regulatory, contractual, customer, security, quality, or industry requirements when replacing systems or changing how information is stored and processed. These requirements should be reviewed throughout the modernization process.<\/div>\n<\/details>\n<details style=\"width: 100%;background: #fff;border-radius: 14px;margin: 0 0 18px;padding: 0 28px;overflow: hidden\">\n<summary style=\"cursor: pointer;position: relative;padding: 24px 48px 24px 0;font-size: 19px;line-height: 1.5;font-weight: 600;color: #111\">17. How much does manufacturing IT modernization typically cost?<span style=\"position: absolute;right: 0;color: #f46048;font-size: 28px;line-height: 1;font-weight: bold\">+<\/span><\/summary>\n<div style=\"padding: 0 0 24px;color: #444;font-size: 16px;line-height: 1.7\">Costs vary widely based on facility size, equipment age, network architecture, software, licensing, cybersecurity requirements, integrations, labor, and project scope. A phased roadmap can help prioritize investments and spread planned costs across multiple budget periods.<\/div>\n<\/details>\n<details style=\"width: 100%;background: #fff;border-radius: 14px;margin: 0 0 18px;padding: 0 28px;overflow: hidden\">\n<summary style=\"cursor: pointer;position: relative;padding: 24px 48px 24px 0;font-size: 19px;line-height: 1.5;font-weight: 600;color: #111\">18. What is dependency mapping and why does it matter?<span style=\"position: absolute;right: 0;color: #f46048;font-size: 28px;line-height: 1;font-weight: bold\">+<\/span><\/summary>\n<div style=\"padding: 0 0 24px;color: #444;font-size: 16px;line-height: 1.7\">Dependency mapping documents how applications, servers, network components, industrial systems, data flows, and business processes rely on one another. Understanding these relationships helps teams anticipate the downstream impact of changing or replacing a system.<\/div>\n<\/details>\n<details style=\"width: 100%;background: #fff;border-radius: 14px;margin: 0 0 18px;padding: 0 28px;overflow: hidden\">\n<summary style=\"cursor: pointer;position: relative;padding: 24px 48px 24px 0;font-size: 19px;line-height: 1.5;font-weight: 600;color: #111\">19. Can smaller manufacturers benefit from a phased modernization approach?<span style=\"position: absolute;right: 0;color: #f46048;font-size: 28px;line-height: 1;font-weight: bold\">+<\/span><\/summary>\n<div style=\"padding: 0 0 24px;color: #444;font-size: 16px;line-height: 1.7\">Yes. A phased approach allows smaller manufacturers to prioritize their highest-risk or highest-value improvements, manage spending over time, test changes before wider deployment, and reduce the operational risk of making too many changes at once.<\/div>\n<\/details>\n<details style=\"width: 100%;background: #fff;border-radius: 14px;margin: 0;padding: 0 28px;overflow: hidden\">\n<summary style=\"cursor: pointer;position: relative;padding: 24px 48px 24px 0;font-size: 19px;line-height: 1.5;font-weight: 600;color: #111\">20. How can a managed IT partner reduce the risk of a modernization project?<span style=\"position: absolute;right: 0;color: #f46048;font-size: 28px;line-height: 1;font-weight: bold\">+<\/span><\/summary>\n<div style=\"padding: 0 0 24px;color: #444;font-size: 16px;line-height: 1.7\">A managed IT partner can help assess existing systems, identify risks and dependencies, develop a phased roadmap, coordinate technology changes, strengthen cybersecurity controls, and provide ongoing support throughout the transition. Specialized OT expertise may also be required for production systems and industrial equipment.<\/div>\n<\/details>\n<\/div>\n<\/div>\n<p><a href=\"https:\/\/cmitsolutions.com\/siliconvalley-ca-1019\/contact-us\/\"><img decoding=\"async\" class=\"aligncenter wp-image-979\" src=\"https:\/\/cmitsolutions.com\/siliconvalley-ca-1019\/wp-content\/uploads\/sites\/96\/2026\/08\/Blue-and-White-Bold-Call-To-Action-LinkedIn-Banner-1200-x-300-px-1024x256.png\" alt=\"\" width=\"804\" height=\"201\" srcset=\"https:\/\/cmitsolutions.com\/siliconvalley-ca-1019\/wp-content\/uploads\/sites\/96\/2026\/08\/Blue-and-White-Bold-Call-To-Action-LinkedIn-Banner-1200-x-300-px-1024x256.png 1024w, https:\/\/cmitsolutions.com\/siliconvalley-ca-1019\/wp-content\/uploads\/sites\/96\/2026\/08\/Blue-and-White-Bold-Call-To-Action-LinkedIn-Banner-1200-x-300-px-300x75.png 300w, https:\/\/cmitsolutions.com\/siliconvalley-ca-1019\/wp-content\/uploads\/sites\/96\/2026\/08\/Blue-and-White-Bold-Call-To-Action-LinkedIn-Banner-1200-x-300-px-768x192.png 768w, https:\/\/cmitsolutions.com\/siliconvalley-ca-1019\/wp-content\/uploads\/sites\/96\/2026\/08\/Blue-and-White-Bold-Call-To-Action-LinkedIn-Banner-1200-x-300-px.png 1200w\" sizes=\"(max-width: 804px) 100vw, 804px\" \/><\/a><\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Manufacturing operations run on a delicate balance. Production lines, inventory systems, and&#8230;<\/p>\n","protected":false},"author":159,"featured_media":1074,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[19,20,29,28,18],"class_list":["post-1066","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-local-it","tag-it-managed-services-sw-silicon-valley","tag-it-support-managed-services-sw-silicon-valley","tag-managed-it-support-company-pleasanton","tag-managed-it-support-pleasanton","tag-sw-silicon-valley-managed-it-provider"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO Pro 5.0.2 - aioseo.com -->\n\t<meta name=\"description\" content=\"Modernize manufacturing IT with less disruption by improving infrastructure, replacing outdated systems, and planning upgrades around production needs.\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"mwelke\"\/>\n\t<link rel=\"canonical\" href=\"https:\/\/cmitsolutions.com\/siliconvalley-ca-1019\/blog\/manufacturing-it-modernization-how-to-upgrade-critical-systems-without-disrupting-production\/\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO Pro (AIOSEO) 5.0.2\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"San Jose, CA 1019 | CMIT Solutions\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"IT Modernization for Manufacturing | CMIT Solutions San Jose\" \/>\n\t\t<meta property=\"og:description\" content=\"Modernize manufacturing IT with less disruption by improving infrastructure, replacing outdated systems, and planning upgrades around production needs.\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/cmitsolutions.com\/siliconvalley-ca-1019\/blog\/manufacturing-it-modernization-how-to-upgrade-critical-systems-without-disrupting-production\/\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2026-09-18T09:11:13+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2026-09-25T09:24:13+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:title\" content=\"IT Modernization for Manufacturing | CMIT Solutions San Jose\" \/>\n\t\t<meta name=\"twitter:description\" content=\"Modernize manufacturing IT with less disruption by improving infrastructure, replacing outdated systems, and planning upgrades around production needs.\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"headline\":\"Manufacturing IT Modernization: How to Upgrade Critical Systems Without Disrupting Production\",\"description\":\"Manufacturing IT Modernization: How to Upgrade Critical Systems Without Disrupting ProductionManufacturing operations run on a delicate balance. Production lines, inventory systems, and quality contro...\",\"author\":{\"@type\":\"Person\",\"name\":\"Your Name\"},\"datePublished\":\"2026-09-25\",\"wordCount\":2952,\"timeRequired\":\"PT15M\",\"keywords\":\"nbsp, modernization, systems, it, manufacturing, production, during, support, project, before\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/cmitsolutions.com\\\/siliconvalley-ca-1019\\\/blog\\\/manufacturing-it-modernization-how-to-upgrade-critical-systems-without-disrupting-production\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/cmitsolutions.com\\\/siliconvalley-ca-1019\\\/#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/cmitsolutions.com\\\/siliconvalley-ca-1019\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/cmitsolutions.com\\\/siliconvalley-ca-1019\\\/blog\\\/category\\\/local-it\\\/#listItem\",\"name\":\"Local IT\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/cmitsolutions.com\\\/siliconvalley-ca-1019\\\/blog\\\/category\\\/local-it\\\/#listItem\",\"position\":2,\"name\":\"Local IT\",\"item\":\"https:\\\/\\\/cmitsolutions.com\\\/siliconvalley-ca-1019\\\/blog\\\/category\\\/local-it\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/cmitsolutions.com\\\/siliconvalley-ca-1019\\\/blog\\\/manufacturing-it-modernization-how-to-upgrade-critical-systems-without-disrupting-production\\\/#listItem\",\"name\":\"Manufacturing IT Modernization: How to Upgrade Critical Systems Without Disrupting Production\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/cmitsolutions.com\\\/siliconvalley-ca-1019\\\/#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/cmitsolutions.com\\\/siliconvalley-ca-1019\\\/blog\\\/manufacturing-it-modernization-how-to-upgrade-critical-systems-without-disrupting-production\\\/#listItem\",\"position\":3,\"name\":\"Manufacturing IT Modernization: How to Upgrade Critical Systems Without Disrupting Production\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/cmitsolutions.com\\\/siliconvalley-ca-1019\\\/blog\\\/category\\\/local-it\\\/#listItem\",\"name\":\"Local IT\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/cmitsolutions.com\\\/siliconvalley-ca-1019\\\/#organization\",\"name\":\"CMIT Solutions San Jose\",\"description\":\"CMIT Solutions\",\"url\":\"https:\\\/\\\/cmitsolutions.com\\\/siliconvalley-ca-1019\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"http:\\\/\\\/cmitsolutions.com\\\/template\\\/wp-content\\\/uploads\\\/sites\\\/2\\\/2022\\\/09\\\/CMMIT-Solutions-Logo.png\",\"@id\":\"https:\\\/\\\/cmitsolutions.com\\\/siliconvalley-ca-1019\\\/blog\\\/manufacturing-it-modernization-how-to-upgrade-critical-systems-without-disrupting-production\\\/#organizationLogo\"},\"image\":{\"@id\":\"https:\\\/\\\/cmitsolutions.com\\\/siliconvalley-ca-1019\\\/blog\\\/manufacturing-it-modernization-how-to-upgrade-critical-systems-without-disrupting-production\\\/#organizationLogo\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/cmitsolutions.com\\\/siliconvalley-ca-1019\\\/blog\\\/author\\\/mwelke\\\/#author\",\"url\":\"https:\\\/\\\/cmitsolutions.com\\\/siliconvalley-ca-1019\\\/blog\\\/author\\\/mwelke\\\/\",\"name\":\"mwelke\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/cmitsolutions.com\\\/siliconvalley-ca-1019\\\/blog\\\/manufacturing-it-modernization-how-to-upgrade-critical-systems-without-disrupting-production\\\/#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/af5527da760510153a5c08482deb6c731199790e93004ed5e4dc9e43776c829c?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"mwelke\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/cmitsolutions.com\\\/siliconvalley-ca-1019\\\/blog\\\/manufacturing-it-modernization-how-to-upgrade-critical-systems-without-disrupting-production\\\/#webpage\",\"url\":\"https:\\\/\\\/cmitsolutions.com\\\/siliconvalley-ca-1019\\\/blog\\\/manufacturing-it-modernization-how-to-upgrade-critical-systems-without-disrupting-production\\\/\",\"name\":\"IT Modernization for Manufacturing | CMIT Solutions San Jose\",\"description\":\"Modernize manufacturing IT with less disruption by improving infrastructure, replacing outdated systems, and planning upgrades around production needs.\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/cmitsolutions.com\\\/siliconvalley-ca-1019\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/cmitsolutions.com\\\/siliconvalley-ca-1019\\\/blog\\\/manufacturing-it-modernization-how-to-upgrade-critical-systems-without-disrupting-production\\\/#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/cmitsolutions.com\\\/siliconvalley-ca-1019\\\/blog\\\/author\\\/mwelke\\\/#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/cmitsolutions.com\\\/siliconvalley-ca-1019\\\/blog\\\/author\\\/mwelke\\\/#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/cmitsolutions.com\\\/siliconvalley-ca-1019\\\/wp-content\\\/uploads\\\/sites\\\/96\\\/2026\\\/09\\\/8-2.png\",\"@id\":\"https:\\\/\\\/cmitsolutions.com\\\/siliconvalley-ca-1019\\\/blog\\\/manufacturing-it-modernization-how-to-upgrade-critical-systems-without-disrupting-production\\\/#mainImage\",\"width\":1200,\"height\":627},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/cmitsolutions.com\\\/siliconvalley-ca-1019\\\/blog\\\/manufacturing-it-modernization-how-to-upgrade-critical-systems-without-disrupting-production\\\/#mainImage\"},\"datePublished\":\"2026-09-18T04:11:13-05:00\",\"dateModified\":\"2026-09-25T04:24:13-05:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/cmitsolutions.com\\\/siliconvalley-ca-1019\\\/#website\",\"url\":\"https:\\\/\\\/cmitsolutions.com\\\/siliconvalley-ca-1019\\\/\",\"name\":\"CMIT Solutions San Jose\",\"description\":\"CMIT Solutions\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/cmitsolutions.com\\\/siliconvalley-ca-1019\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO Pro -->\r\n\t\t<title>IT Modernization for Manufacturing | CMIT Solutions San Jose<\/title>\n\n","aioseo_head_json":{"title":"IT Modernization for Manufacturing | CMIT Solutions San Jose","description":"Modernize manufacturing IT with less disruption by improving infrastructure, replacing outdated systems, and planning upgrades around production needs.","canonical_url":"https:\/\/cmitsolutions.com\/siliconvalley-ca-1019\/blog\/manufacturing-it-modernization-how-to-upgrade-critical-systems-without-disrupting-production\/","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","headline":"Manufacturing IT Modernization: How to Upgrade Critical Systems Without Disrupting Production","description":"Manufacturing IT Modernization: How to Upgrade Critical Systems Without Disrupting ProductionManufacturing operations run on a delicate balance. Production lines, inventory systems, and quality contro...","author":{"@type":"Person","name":"Your Name"},"datePublished":"2026-09-25","wordCount":2952,"timeRequired":"PT15M","keywords":"nbsp, modernization, systems, it, manufacturing, production, during, support, project, before"},{"@type":"BreadcrumbList","@id":"https:\/\/cmitsolutions.com\/siliconvalley-ca-1019\/blog\/manufacturing-it-modernization-how-to-upgrade-critical-systems-without-disrupting-production\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/cmitsolutions.com\/siliconvalley-ca-1019\/#listItem","position":1,"name":"Home","item":"https:\/\/cmitsolutions.com\/siliconvalley-ca-1019\/","nextItem":{"@type":"ListItem","@id":"https:\/\/cmitsolutions.com\/siliconvalley-ca-1019\/blog\/category\/local-it\/#listItem","name":"Local IT"}},{"@type":"ListItem","@id":"https:\/\/cmitsolutions.com\/siliconvalley-ca-1019\/blog\/category\/local-it\/#listItem","position":2,"name":"Local IT","item":"https:\/\/cmitsolutions.com\/siliconvalley-ca-1019\/blog\/category\/local-it\/","nextItem":{"@type":"ListItem","@id":"https:\/\/cmitsolutions.com\/siliconvalley-ca-1019\/blog\/manufacturing-it-modernization-how-to-upgrade-critical-systems-without-disrupting-production\/#listItem","name":"Manufacturing IT Modernization: How to Upgrade Critical Systems Without Disrupting Production"},"previousItem":{"@type":"ListItem","@id":"https:\/\/cmitsolutions.com\/siliconvalley-ca-1019\/#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/cmitsolutions.com\/siliconvalley-ca-1019\/blog\/manufacturing-it-modernization-how-to-upgrade-critical-systems-without-disrupting-production\/#listItem","position":3,"name":"Manufacturing IT Modernization: How to Upgrade Critical Systems Without Disrupting Production","previousItem":{"@type":"ListItem","@id":"https:\/\/cmitsolutions.com\/siliconvalley-ca-1019\/blog\/category\/local-it\/#listItem","name":"Local IT"}}]},{"@type":"Organization","@id":"https:\/\/cmitsolutions.com\/siliconvalley-ca-1019\/#organization","name":"CMIT Solutions San Jose","description":"CMIT Solutions","url":"https:\/\/cmitsolutions.com\/siliconvalley-ca-1019\/","logo":{"@type":"ImageObject","url":"http:\/\/cmitsolutions.com\/template\/wp-content\/uploads\/sites\/2\/2022\/09\/CMMIT-Solutions-Logo.png","@id":"https:\/\/cmitsolutions.com\/siliconvalley-ca-1019\/blog\/manufacturing-it-modernization-how-to-upgrade-critical-systems-without-disrupting-production\/#organizationLogo"},"image":{"@id":"https:\/\/cmitsolutions.com\/siliconvalley-ca-1019\/blog\/manufacturing-it-modernization-how-to-upgrade-critical-systems-without-disrupting-production\/#organizationLogo"}},{"@type":"Person","@id":"https:\/\/cmitsolutions.com\/siliconvalley-ca-1019\/blog\/author\/mwelke\/#author","url":"https:\/\/cmitsolutions.com\/siliconvalley-ca-1019\/blog\/author\/mwelke\/","name":"mwelke","image":{"@type":"ImageObject","@id":"https:\/\/cmitsolutions.com\/siliconvalley-ca-1019\/blog\/manufacturing-it-modernization-how-to-upgrade-critical-systems-without-disrupting-production\/#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/af5527da760510153a5c08482deb6c731199790e93004ed5e4dc9e43776c829c?s=96&d=mm&r=g","width":96,"height":96,"caption":"mwelke"}},{"@type":"WebPage","@id":"https:\/\/cmitsolutions.com\/siliconvalley-ca-1019\/blog\/manufacturing-it-modernization-how-to-upgrade-critical-systems-without-disrupting-production\/#webpage","url":"https:\/\/cmitsolutions.com\/siliconvalley-ca-1019\/blog\/manufacturing-it-modernization-how-to-upgrade-critical-systems-without-disrupting-production\/","name":"IT Modernization for Manufacturing | CMIT Solutions San Jose","description":"Modernize manufacturing IT with less disruption by improving infrastructure, replacing outdated systems, and planning upgrades around production needs.","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/cmitsolutions.com\/siliconvalley-ca-1019\/#website"},"breadcrumb":{"@id":"https:\/\/cmitsolutions.com\/siliconvalley-ca-1019\/blog\/manufacturing-it-modernization-how-to-upgrade-critical-systems-without-disrupting-production\/#breadcrumblist"},"author":{"@id":"https:\/\/cmitsolutions.com\/siliconvalley-ca-1019\/blog\/author\/mwelke\/#author"},"creator":{"@id":"https:\/\/cmitsolutions.com\/siliconvalley-ca-1019\/blog\/author\/mwelke\/#author"},"image":{"@type":"ImageObject","url":"https:\/\/cmitsolutions.com\/siliconvalley-ca-1019\/wp-content\/uploads\/sites\/96\/2026\/09\/8-2.png","@id":"https:\/\/cmitsolutions.com\/siliconvalley-ca-1019\/blog\/manufacturing-it-modernization-how-to-upgrade-critical-systems-without-disrupting-production\/#mainImage","width":1200,"height":627},"primaryImageOfPage":{"@id":"https:\/\/cmitsolutions.com\/siliconvalley-ca-1019\/blog\/manufacturing-it-modernization-how-to-upgrade-critical-systems-without-disrupting-production\/#mainImage"},"datePublished":"2026-09-18T04:11:13-05:00","dateModified":"2026-09-25T04:24:13-05:00"},{"@type":"WebSite","@id":"https:\/\/cmitsolutions.com\/siliconvalley-ca-1019\/#website","url":"https:\/\/cmitsolutions.com\/siliconvalley-ca-1019\/","name":"CMIT Solutions San Jose","description":"CMIT Solutions","inLanguage":"en-US","publisher":{"@id":"https:\/\/cmitsolutions.com\/siliconvalley-ca-1019\/#organization"}}]},"og:locale":"en_US","og:site_name":"San Jose, CA 1019 | CMIT Solutions","og:type":"article","og:title":"IT Modernization for Manufacturing | CMIT Solutions San Jose","og:description":"Modernize manufacturing IT with less disruption by improving infrastructure, replacing outdated systems, and planning upgrades around production needs.","og:url":"https:\/\/cmitsolutions.com\/siliconvalley-ca-1019\/blog\/manufacturing-it-modernization-how-to-upgrade-critical-systems-without-disrupting-production\/","article:published_time":"2026-09-18T09:11:13+00:00","article:modified_time":"2026-09-25T09:24:13+00:00","twitter:card":"summary_large_image","twitter:title":"IT Modernization for Manufacturing | CMIT Solutions San Jose","twitter:description":"Modernize manufacturing IT with less disruption by improving infrastructure, replacing outdated systems, and planning upgrades around production needs."},"aioseo_meta_data":{"post_id":"1066","title":"IT Modernization for Manufacturing | CMIT Solutions San Jose","description":"Modernize manufacturing IT with less disruption by improving infrastructure, replacing outdated systems, and planning upgrades around production needs.","keywords":null,"keyphrases":{"focus":{"keyphrase":"","score":0,"analysis":{"keyphraseInTitle":{"score":0,"maxScore":9,"error":1}}},"additional":[]},"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":"","og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[{"id":"#aioseo-custom-mugr3wtdeqiw","custom":true,"graphName":"Article","schema":"{ \"@type\": \"Article\", \"headline\": \"Manufacturing IT Modernization: How to Upgrade Critical Systems Without Disrupting Production\", \"description\": \"Manufacturing IT Modernization: How to Upgrade Critical Systems Without Disrupting ProductionManufacturing operations run on a delicate balance. Production lines, inventory systems, and quality contro...\", \"author\": { \"@type\": \"Person\", \"name\": \"Your Name\" }, \"datePublished\": \"2026-09-25\", \"wordCount\": 2952, \"timeRequired\": \"PT15M\", \"keywords\": \"nbsp, modernization, systems, it, manufacturing, production, during, support, project, before\" }"}],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"BlogPosting","isEnabled":false},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":"-1","robots_max_videopreview":"-1","robots_max_imagepreview":"large","priority":null,"frequency":"default","local_seo":null,"seo_analyzer_scan_date":null,"breadcrumb_settings":null,"limit_modified_date":false,"open_ai":null,"ai":{"faqs":[],"keyPoints":[],"schemas":[],"titles":[],"descriptions":[],"socialPosts":{"email":{"subject":"","preview":"","content":""},"linkedin":[],"twitter":[],"facebook":[],"instagram":[]}},"created":"2026-09-25 09:11:13","updated":"2026-09-25 10:14:09","focus_keyword":null,"additional_keywords":null,"truseo_locale":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/cmitsolutions.com\/siliconvalley-ca-1019\/\" title=\"Home\">Home<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/cmitsolutions.com\/siliconvalley-ca-1019\/blog\/category\/local-it\/\" title=\"Local IT\">Local IT<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\tManufacturing IT Modernization: How to Upgrade Critical Systems Without Disrupting Production\n<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/cmitsolutions.com\/siliconvalley-ca-1019\/"},{"label":"Local IT","link":"https:\/\/cmitsolutions.com\/siliconvalley-ca-1019\/blog\/category\/local-it\/"},{"label":"Manufacturing IT Modernization: How to Upgrade Critical Systems Without Disrupting Production","link":"https:\/\/cmitsolutions.com\/siliconvalley-ca-1019\/blog\/manufacturing-it-modernization-how-to-upgrade-critical-systems-without-disrupting-production\/"}],"_links":{"self":[{"href":"https:\/\/cmitsolutions.com\/siliconvalley-ca-1019\/wp-json\/wp\/v2\/posts\/1066","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cmitsolutions.com\/siliconvalley-ca-1019\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/cmitsolutions.com\/siliconvalley-ca-1019\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/cmitsolutions.com\/siliconvalley-ca-1019\/wp-json\/wp\/v2\/users\/159"}],"replies":[{"embeddable":true,"href":"https:\/\/cmitsolutions.com\/siliconvalley-ca-1019\/wp-json\/wp\/v2\/comments?post=1066"}],"version-history":[{"count":0,"href":"https:\/\/cmitsolutions.com\/siliconvalley-ca-1019\/wp-json\/wp\/v2\/posts\/1066\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/cmitsolutions.com\/siliconvalley-ca-1019\/wp-json\/wp\/v2\/media\/1074"}],"wp:attachment":[{"href":"https:\/\/cmitsolutions.com\/siliconvalley-ca-1019\/wp-json\/wp\/v2\/media?parent=1066"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/cmitsolutions.com\/siliconvalley-ca-1019\/wp-json\/wp\/v2\/categories?post=1066"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/cmitsolutions.com\/siliconvalley-ca-1019\/wp-json\/wp\/v2\/tags?post=1066"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}